
The Infrastructure Layer of the Intelligence Era
Distributed AI compute nodes. Powered by renewable energy. Welcomed by communities. Backed by governments.
This Is the American Tower Moment for AI.
We are building it.
The West Is Running Out of Three Things
Land
- โHyperscale needs 5โ500 acres
- โZoning takes years
- โPrime sites are gone
- โCommunities say no
Power
- โ3โ7 year queue in US/EU
- โPower defines site selection
- โNot capital โ interconnection
- โGrid can't keep up
Permission
- โ430 opposition groups active
- โ$130B blocked in Q1 2026
- โ40% of projects withdrawn
- โRegulation accelerating
Big Tech has wagered $1 trillion on communities saying yes. Increasingly โ they say no.
The Inference Wave Is Moving East
The Market
- โInference overtakes training by 2027
- โIndia data centre market: $22B by 2030
- โGoogle: $15B committed in Andhra Pradesh
- โMicrosoft: $17.5B committed across India
- โ70% of compute in just 2 cities today
- โ900M users need compute everywhere else
$126B+
Committed to India DCs
28โ32%
Edge compute CAGR
1 GW
OpenAI considering in India
19.5%
Edge DC CAGR 2025โ33
The demand is here. The infrastructure doesn't exist where 900 million users actually are. That gap is our market.
We are focused exclusively on solving this โ powering Tier 2 with the largest pool of AI inference capacity outside the West.
Sovereign AI Is Mandated โ Not Optional
Regulation Is Forcing Compute Into Our Markets
- India DPDP Act 2023Data must stay in India
- Saudi NCANational data residency mandatory
- EU AI Actโฌ35M fines for non-compliance
- HIPAA / FedRAMPRegulated data can't leave perimeter
- Every AI company serving IndiaMust host locally
1.4B
People covered by DPDP Act
โฌ35M
Max EU AI Act fine
$126B
Committed to India needing local infra
2027
DPDP enforcement deadline
โOpenAI, Microsoft, and Google are contractually obligated to store Indian user data in India. Right now, the infrastructure to do that at scale outside Mumbai doesn't exist. Valanor is building it.โ
Data localisation is not a risk to our business. It is the business case for every rack we deploy.
Built to Operate at Global Scale
1,500+ locations pipelined and committed. A 36,000-location village network under contract. 1 GW+ of power pre-committed across every site. The same playbook, replicating across every market with land and sun.
1,500+
Locations pipelined
1 GW+
Power pre-committed
36,000
Village network
7
Global markets
What We Do
Energy Optimised
Signed PPA at $0.061/unit.
AI Ready
CPU + GPU inference tiers.
Community First
Co-owners, not opponents.
Environmentally Responsible
Zero water. Zero emissions.
Investable
IRR 25-35%+ across scenarios.
Infinitely Scalable
Same playbook, different flags.
Two Tiers
Tier 1
CPU Inference (Telco MDCs)
- โข500 sites โ telco committed today
- โขTelco funds all capex โ zero cost to us
- โข750,000 CPU inference cores
- โขLLM, RAG, voice AI, vision, BharatNet
- โขNo GPU. No substation. No friction.
- โขDeployable in 4โ8 weeks
Tier 2
GPU Inference (Govt MDCs)
- โข1,000+ government-powered sites (100 in P1)
- โข1MW+ industrial connection per site
- โขNVIDIA L4/L40S GPU inference
- โข$10K/site + 50% power subsidy
- โข1 GW pre-approved power โ now
- โขSovereign AI + hyperscaler workloads
Why Communities Welcome Us
| Concern | Hyperscale DC | Valanor MDC |
|---|---|---|
| Water consumption | 5M+ gallons/day | ZERO โ air cooling, no towers |
| Grid disruption | City-scale single load | Industrial โ ring-fenced |
| Noise | 80โ90 dB | 40โ45 dB โ library quiet |
| Land use | 5โ500 acres | 500 sqft per site |
| Heat generation | Massive urban heat island | Negligible โ distributed |
| Build time | 18โ36 months | 4โ8 weeks per container |
| Local jobs | Minimal | 1โ2 permanent per site |
| Community benefit | None | Co-own + asset transfer yr 5 |
The Energy Moat
$0.061/unit โ $0.144/unit
$0.083/unit margin per unit
| PPA Detail | Value | |
|---|---|---|
| Signed rate | $0.061/unit (solar PPA) | |
| Status | Signed | |
| Capacity | 2MW solar project โ live today |
| Scale | Monthly Margin | Annual Margin |
|---|---|---|
| Tier 1 CPU โ 500 sites | $90K | $1.08M |
| Tier 2 GPU โ 1,000 sites | $3M | $36M |
| Combined โ 1,500 sites | $3.6M | $43.2M |
| 5,000 sites (Year 3) | $12M | $144M |
The Telco Parallel
| Metric | Telco Tower (1990s) | Valanor (2025+) |
|---|---|---|
| Asset owned | Land + steel | Land + PPA + MDC + Solar |
| Tenants | Local mobile operators | Global hyperscalers + AI companies |
| Demand driver | Local voice + data users | 5 billion global internet users |
| Revenue streams | Tower lease only | Rack + power + PPA + RECs + carbon |
| Power | Not owned | Owned โ $0.061 buy / $0.144 sell |
| Capex | Self-funded | Zero โ telco partner funded |
| Community | Neutral | Co-owners + beneficiaries |
| Exit multiple | 20โ30ร EBITDA | 25โ35ร AI infra premium |
What We Have Built
500-site telco MDC partnership with a 27,000-tower national partner
Signed government power connection MoUs across Maharashtra and Andhra Pradesh
Signed state government MoU
Signed state government MoU
Signed solar PPA at $0.061/unit
Endorsed by the Maharashtra Chamber of Commerce, Industry & Agriculture
36,000-location OVOE/OFOE village network
1,500+ live operational nodes
Abha + Jubail mayor conversations โ land + solar + wind
Three Models
A โ Extremely Lean
0โ6 Months ยท Validate
- โขOwn: Land lease + PPA
- โขOwn: Demand layer
- โขPartner funds all capex
- โขRevenue: $56/rack + power
IRR: 18โ25%
Payback: 5โ6 yrs
B โ Energy Play
6โ12 Months ยท Scale
- โขOwn: Land + PPA + Solar
- โขOwn: Environmental attributes
- โขAdd RECs + carbon credits
- โขImproving power margins
- โขCapex: ~$1.2M/cluster
IRR: 20โ30%
Payback: 6โ7 yrs
C โ Full Stack
12โ18 Months ยท Dominate
- โขOwn: Everything โ Land + PPA + Solar + MDC
- โขAI infra + compute offtake
- โขEvery revenue layer active
- โขThe infrastructure exit story
IRR: 25โ35%+
Payback: 6โ7 yrs