A Decentralized Infrastructure Ecosystem

Local partners bring the land and power. We bring the hardware, the orchestration layer, and the demand. Two ways to build this together — one for every level of capital commitment.

We're Building the Decentralized AWS.

Compute and cloud infrastructure, owned locally and orchestrated globally — not centralized in a handful of hyperscale campuses.

Two Ways to Partner

The more capital a partner brings to a site, the more of that site's revenue they keep.

Land & Power Partner

You bring the land and the power connection. The MDC hardware itself is funded through community capital — Valanor deploys the orchestration layer and brings the tenant demand.

Partner contributes

  • +Land
  • +Power connection

Valanor contributes

  • +MDC hardware (community-funded)
  • +Orchestration layer
  • +Demand / tenant pipeline

Entry-tier revenue share (TODO: confirm exact split)

Full Infrastructure Partner

You bring the land, the power, and fund the MDC hardware outright. Valanor deploys zero capex on your site — orchestration layer and demand only — so your revenue share is higher.

Partner contributes

  • +Land
  • +Power connection
  • +MDC hardware (full capex)

Valanor contributes

  • +Orchestration layer
  • +Demand / tenant pipeline

Premium revenue share (TODO: confirm exact split)

Operator Career Path

Independent of who funds a site, every site needs someone to run it day to day.

Trainee

$89–$133/month (TODO: confirm exact deck figure)

Entry-level site training under an active Operator

Operator

$167–$222/month (TODO: confirm exact deck figure)

Runs day-to-day operations for one MDC site

Senior Operator

$278–$389/month (TODO: confirm exact deck figure)

Oversees multiple sites and trains new Operators

Node Owner

Revenue share + equity stake (TODO: confirm exact deck figure)

Co-owns the site under the year-5 asset transfer model

Community vs. Hyperscale

ConcernHyperscale DCValanor MDC
Water consumption5M+ gallons/dayZERO — air cooling, no towers
Grid disruptionCity-scale single loadIndustrial — ring-fenced
Noise80–90 dB40–45 dB — library quiet
Land use5–500 acres500 sqft per site
Heat generationMassive urban heat islandNegligible — distributed
Build time18–36 months4–8 weeks per container
Local jobsMinimal1–2 permanent per site
Community benefitNoneCo-own + asset transfer yr 5

Environmental Profile

Noise

40–45 dB — library quiet

Water Consumption

ZERO — air cooling, no towers

Emissions

Zero water. Zero emissions.